references image hero

Our
References

reference 1

Case: Kapmes

  • PartnersO3 SHIFT and ABN Architecten
  • Nr of entities71 appartments / 3 modern buildings
  • LocationLier

SEDS is constructing 71 energy-neutral flats comprising three buildings. They are doing so in collaboration with ABN Architects. Both parties have long been committed to energy-efficient and circular construction. With the integration of SEDS, their project marks the official start of the energy switch.

In collaboration with project developer O3 SHIFT and ABN Architects, SEDS BV is implementing a sustainable energy solution using a collective geothermal heat pump, PV panels and charging stations.

Schermafbeelding 2025 12 16 102638

Case: Jardin Maritime

  • PartnersThys Bouwprojecten NV
  • Nr of entities21 appartments / 1 modern building
  • LocationSint-Jans-Molenbeek

In collaboration with project developer O3 SHIFT and ABN Architects, SEDS BV is implementing a sustainable energy solution using a collective geothermal heat pump, PV panels and charging stations.

WhatsApp Image 2025 12 16 at 11.14.22

Case: Kleindokkaai

  • PartnersThys Bouwprojecten NV
  • Nr of entities74 appartments / 2 modern buildings
  • LocationGent

For this project, SEDS BV developed an energy concept with a collective heat pump system and PV panels on behalf of Thys Bouwprojecten NV.

AMS 1784 VLI TUR 20231123 Beeld A scaled.jpg

Case: Tracks

  • PartnersTervia’s Orange NV
  • Nr of entities33 appartments / 1 modern building
  • LocationTurnhout

In this project, SEDS BV, in collaboration with project developer Tervia’s Orange NV, is providing the sustainable energy infrastructure with geothermal energy, solar panels and charging stations.

zillelande in mol 2359

Case: Keirlandse-Zillen

  • PartnersCores Development NV
  • Nr of entities86 appartments / 4 modern buildings
  • LocationMol

Together with Cores Development, SEDS BV is implementing a smart combination of collective geothermal energy, PV panels and electric charging stations.

Preview01b Valverde01

Case: Valverde

  • PartnersVillapark Steenfort VVZRL
  • Nr of entities20 appartments / 2 modern buildings
  • LocationKasterlee

SEDS BV is implementing a sustainable energy system for project developer Villapark Steenfort VVZRL based on collective geothermal energy, supplemented with solar panels and charging facilities.

Lint Residentie Greenhouse appartementen te koop 1

Case: Greenhouse

  • PartnersCores Development NV
  • Nr of entities34 appartments / 4 modern buildings
  • LocationLint

Commissioned by Cores Development, SEDS BV is integrating collective geothermal heat pumps, PV panels and charging stations into this future project.

CAM 1 scaled 1

Case: Marihoof

  • PartnersOak properties
  • Nr of entities35 appartments / 1 modern building
  • LocationKontich

This project incorporates sustainable technologies, designed and implemented by SEDS BV in collaboration with Oak Properties, including geothermal energy, solar panels, and charging stations.

Schermafbeelding 2025 12 16 104407

Case: De Stip

  • PartnersBopro
  • Nr of entities91 appartments / 7 modern buildings
  • LocationGentbrugge

SEDS BV developed an energy-efficient solution for Bopro with a collective geothermal system, PV panels and charging stations for electric transport.

Schermafbeelding 2025 12 16 104733

Case: De Schakel

  • PartnersBopro
  • Nr of entities51 appartments / 3 modern buildings
  • LocationDenderleeuw

SEDS BV is collaborating with Bopro to create a sustainable living environment through the use of collective geothermal energy, solar energy, and charging facilities.

Schermafbeelding 2025 12 16 095921

Case: Werft

  • PartnersVanhout Projects
  • Nr of entities33 appartments / 1 modern building
  • LocationGeel

In collaboration with project developer Vanhout Projects, SEDS BV has equipped this project with collective geothermal installations, PV panels and charging stations.

Schermafbeelding 2025 12 16 105555

Case: Abeelstraat

  • PartnersInvestpro NV
  • Nr of entities50 appartments / 2 modern buildings
  • LocationMechelen

For this project, SEDS BV and Investpro NV combined their expertise in an energy concept involving collective geothermal energy, solar panels and electric charging stations.

BV1288 ext A 2024.10.02 scaled

Case: Kloostersite

  • PartnersDevelopment Coordination
  • Nr of entities58 appartments / 2 modern buildings
  • LocationBerlaar

SEDS BV provides Development Coordination with sustainable energy supplies, consisting of collective geothermal heating, PV panels and charging stations.

Want to know more about SEDS?